Hi dericag,
I visited Berlin in December and checked the flat.I saw with my own eyes that there was nothing done.All the more I was surprised that there was
the confirmation(Date:Oktober) of the Tuev Sued.I called Tuev Sued how this could happen. :
Before the refurbishment begins,the Tuev checks the flat and instructs Dr O,Kapall,UTB or whomever,what is to do to fulfill the conditions of the
modernisation contract(and to get the modernisation bond).When the refurbishment is done Dr.O. gives a report to Tuev Sued that the flat is ok.
Finally Tuev Sued gives Dr.O. the confirmation that the refurbishment is finished.There is no 2.Check!!!!!.
Unfortunately Dr O forgot to refurbish our flat before he gives the report to the Tuev.
I would like to apologize for my English,because it's not my mother tongue